I built a home 5 years ago and had the basement "preped" for a half bath (meaning that the toilet drain plumbing is embedded in the concrete). I am now considering including a shower but I am not sure what would be required in terms of plumbing the drain pipe. Will the concrete have to be disturbed or is there a work around. Thanks.
 
Posts: 45 | Location: East Stroudsburg, PA | Registered: 17 August 2005Reply With QuoteEdit or Delete MessageReport This Post