Our contractor installed BR 111 Engineered Hardwod Flooring directly on the concrete floor in our basement. There are two areas where there is an adhesion problem. He says he was on another job where this problem occurred and an injection kit with a needle was used to shoot urethane through the boards. He does not remember the name of the kit or manufacturer. Is anyone familiar with this product? I would greatly appreciate any assistance.
That would be nice. This project has left me with very little faith in the professionalism of many contractors. The old saying seems to be true- if you want it done right (or at all), do it yourself!