|  Newsletter
Blogs  |  ProTV  |  Message Boards  |  Sweepstakes  |  Best of HGTVPro
HGTVPro.com
Newsletter Signup
Subscribe to HGTVProFile for
timely information on new
products, best practices,
professional advice and more.

Subscribe Now!
Sponsored Content





Message Boards

 
  boards.hgtvpro.com
  HGTVPro Message Boards
Hop To Forum Categories   Best Practices
Hop To Forums   Framing
  Cutting Joist Ledger in Balloon Framing
Go
New
Find
Notify
Tools
Reply
  
  Login/Join 
Posted
I'm trying to add a 1/2 bath to the second floor of my 1900 farm house. My DWV pipe passes right through the recessed 1x4 that runs accross all the studs that my second floor joists "sit" on. Can I cut this small section of 1x4 out so I can get my DWV line through? All the floor joists will still be sitting on this 1x4 & still be face nailed to each stud.

Thanks,
Dan
 
Posts: 2 | Location: Arlington, Indiana | Registered: 09 November 2006Reply With QuoteEdit or Delete MessageReport This Post
Posted Hide Post
the ledger is there to carry the load of the floor joists. the face nailing is not sufficient alone. you can cut the ledger if you first thru bolt the floor joists to the studs with a couple of galvanized bolts, washers and nuts in each stud on either side of the cut. then cut the ledger making sure to leave enough of the ledger for the joist to sit on.
 
Posts: 14 | Registered: 12 November 2006Reply With QuoteEdit or Delete MessageReport This Post